AQO 556/17-22


Ms Paula Bradshaw
Alliance Party
South Belfast


Tabled Date: 01/09/2020
Answered On Date: 07/09/2020
Priority Written: No


Question:
To ask the Minister for Infrastructure for an update on the project to provide a right-turn pocket from the A24 Saintfield Road into Baronscourt Road, including a timescale for the completion of the ongoing feasibility study.


Answer:
I can confirm that my Department has commenced a feasibility study to examine a number of options for the potential provision of a right turn pocket and pedestrian facilities at the A24 Saintfield Road / Baronscourt Road junction. As part of this study, a number of preliminary layouts have been identified.
However, to further consider these options, a topographical survey is required to provide an accurate layout of the existing junction and determine the impact of each option on adjacent land and properties. Completion of the required topographical survey has been delayed by the COVID19 pandemic and once current restrictions have been fully lifted, the topographical survey will be carried out and the junction assessed to consider a number of preliminary alignments.