AQW 31115/17-22


Ms Claire Sugden
Independent
East Londonderry


Tabled Date: 22/03/2022
Answered On Date: 24/03/2022
Priority Written: No


Question:
To ask the Minister for Infrastructure pursuant to AQW 30742/17-22, whether wastewater infrastructure provision in Limavady is also of a standard to support the construction of future developments.


Answer:
NI Water has advised that there are three investment schemes proposed for the Limavady area in Price Control 21 (2021-2027), subject to funding. These are Bovally wastewater pumping station (£1.35m), Limavady catchment upgrades (£2.133m) and Ballyclose Street Combined Sewer Overflow (£1.256m) and once they have been completed successfully, this should address most, if not all, of the existing catchment constraints.
According to NI Water’s analysis, conducted in July 2021, NI Water has advised that the headroom capacity of the Limavady wastewater treatment works would permit the connection of approximately 1200 domestic properties, taking into account an allowance for non-domestic development.