AQW 16684/22-27 Mrs Diane Dodds Democratic Unionist Party Upper Bann
Tabled Date: 14/10/2024 Answered On Date: 16/12/2024 Priority Written: No
Question: To ask the Minister of Health to detail the additional costs incurred by the Belfast Health and Social Care Trust for work required on the Critical Care Building following handover from the contractor.
Answer:
The Critical Care Building was handed over from the contractor in April 2015. The Belfast Health & Social Care Trust has advised that the total expenditure on the Critical Care Building following handover from the Contractor is £14,094,417.85 This is made up as follows:£ Phase 2B Critical Care Building9,628,939.83 Helipad1,198,076.83 Automatic Meter Reading System-Estate12,865.29 Medical Records Store - Phase 2B RVH7,354.55 RGH ED CCTV Cameras53,750.72 Hybrid Vascular Theatre1,304,433.24 Add Air Handling Unit - RVH Estates119,843.34 Omnicell Drug Cabinet - 5e/6e/6f RVH20,456.64 Invest To Save-Led Lighting-Phase 1 RVH36,660.22 Omnicell Drugs Cabinets - CCB RVH12,612.93 Led Lighting6,102.31 Chiller & LTHW Resilience Work123,769.27 Encompass EUD-Estates Works203,091.50 Replace BMS Systems RGH495,000.00 RVH CCB-LTHW-Splitting the System15,516.44 Rapidaer Auto Washer Disinfect213,266.62 ED-Design & Planning X-Ray Area428,550.88 ED Redesign & Planning Majors A Area RVH48,412.50 Covid-19 Medical Gases Trustwide74,341.84 Theatre 13 Ventilation Works-RVH91,372.90 Note, RGH = Royal Group of Hospitals, RVH =Royal Victoria Hospital, CCB = Critical Care Building, ED = Emergency Department, LTHW = Low Temperature Hot Water, BMS = Building Management System
|