AQW 19199/22-27 Mr David Honeyford Alliance Party Lagan Valley
Tabled Date: 03/12/2024 Answered On Date: 02/01/2025 Priority Written: No
Question: To ask the Minister for Infrastructure when the reflective road studs on the A1 between Sprucefield and the border at Meigh were last (i) reviewed; and (ii) improved.
Answer:
The A1 Dual Carriageway from Sprucefield to the border is maintained on behalf of my Department by Amey Roads (NI) under the Design, Build, Finance and Operate package 2 contract. The DBFO contractor inspects road studs on an annual basis, with the last inspection carried out during August 2024. A programme of repairs is underway and will be completed early 2025 subject to favourable weather conditions.
|